(a) running meter
(b) MT
(c) square meter
(d) cubic meter
Ans :- (b) MT
Explanation :-
Steel rebar work is calculated in MT.
- It can be calculated by calculating the cutting length of steel for a specific element.
- Then, multiplying it by weight of steel per meter length.
- Finally, summing up the steel far all the elements and members present in that project.



