Engineering Management Old Question Practice

By admin

Updated on:

Follow Us
60+ Old Questions of Engineering Management
-- Advestisement --
0%
0 votes, 0 avg
2
Created on

Civil Sub Engineering

Engineering Management Old Question Practice

Fill Your Details

1 / 50

1. A contractors can start the construction works following the receipts of

2 / 50

2. The time b which a particular activity may be delayed without affecting the proceeding and succeeding activities is known as

3 / 50

3. Commonly adopted method if planning the construction activities and labour in a project to optimize the construction period is

4 / 50

4. Performance security is necessary

5 / 50

5. Most of the works related to measurement of items and making entry to the measurement book is initiated by

6 / 50

6. Petty contract is:

7 / 50

7. The amount of publish for tends in national paper is

8 / 50

8. A construction schedule is prepared after collecting

9 / 50

9. The tender is

10 / 50

10. The technology and or software used for project planning includes all but

11 / 50

11. Reasons for cost and time-extension in any project are

12 / 50

12. Various activities of a project, are shown on bar charts by:

13 / 50

13. The term CPM in construction management is an abbreviation of

14 / 50

14. Which of the following types of selection is adopted broadly in Nepal for the procurement for services ?

15 / 50

15. Which method is known as minimum cost or maximum times schedule method

16 / 50

16. What is the maximum overhead added to the rate analysis?

17 / 50

17. Necessary elements of the estimate are

18 / 50

18. What are the key dates of a standard contracting procedure of a project?

19 / 50

19. Contractor tax

20 / 50

20. Line of balance technique used for

21 / 50

21. Which technique was used firstly for the planning of a project

22 / 50

22. Most frequently used method of organizing labour for a construction project is based on

23 / 50

23. The dummy activity in CPM

24 / 50

24. Tender does not contain

25 / 50

25. It means offerings, giving, receiving, or soliciting directly or indirectly, anything of value of influencing improperly the action of another party

26 / 50

26. Responsibility of overseer is to

27 / 50

27. Construction schedule is prepared after collecting

28 / 50

28. Which of the following in not a basic requirements for quality control method adapted in a project?

29 / 50

29. Tender guarantee is generally

30 / 50

30. The difference between the time available to do the job and time required to do the job is known

31 / 50

31. Contractor profile is added for

32 / 50

32. The CPM stands for

33 / 50

33. Contractor’s profit and overhead is

34 / 50

34. The completion report includes

35 / 50

35. Muster rolls are used for

36 / 50

36. In critical path method (CPM), the actual performance of task is called

37 / 50

37. Code used in Nepal for building construction/design is

38 / 50

38. As per the prevailing regulation (PRR) in Nepal, what is the % of the price escalation contingency to be provided at the end of the earth estimate preparation ?

39 / 50

39. For the procurement of works, what is the maximum estimates amount for which a tender notice is not mandatory ?

40 / 50

40. Work charge establishment.

41 / 50

41. PERT analysis is based on

42 / 50

42. Types of organizations used in construction industry is

43 / 50

43. The authority to approve a variation order of an amount exceeding Rs 5 but less than 15% of contract amount is

44 / 50

44. A contract is

45 / 50

45. A muster roll is

46 / 50

46. The first stage of a construction is

47 / 50

47. The role of consultant is to

48 / 50

48. A slack of head event and different between total float and free float is

49 / 50

49. The dispute in construction is resolved through discussion of all parties on their respective stands leading to the consensus. The process is called

50 / 50

50. Which types of networks was first develops for planning of any project