Engineering Management Old Question Practice

By admin

Updated on:

Follow Us
60+ Old Questions of Engineering Management
-- Advestisement --
0%
0 votes, 0 avg
2
Created on

Civil Sub Engineering

Engineering Management Old Question Practice

Fill Your Details

1 / 50

1. A contractors can start the construction works following the receipts of

2 / 50

2. A construction schedule is prepared after collecting

3 / 50

3. Which types of networks was first develops for planning of any project

4 / 50

4. Contractor tax

5 / 50

5. Petty contract is:

6 / 50

6. Which technique was used firstly for the planning of a project

7 / 50

7. A slack of head event and different between total float and free float is

8 / 50

8. Tender guarantee is generally

9 / 50

9. Code used in Nepal for building construction/design is

10 / 50

10. Performance security is necessary

11 / 50

11. It means offerings, giving, receiving, or soliciting directly or indirectly, anything of value of influencing improperly the action of another party

12 / 50

12. The completion report includes

13 / 50

13. The technology and or software used for project planning includes all but

14 / 50

14. The amount of publish for tends in national paper is

15 / 50

15. The time b which a particular activity may be delayed without affecting the proceeding and succeeding activities is known as

16 / 50

16. Reasons for cost and time-extension in any project are

17 / 50

17. The dispute in construction is resolved through discussion of all parties on their respective stands leading to the consensus. The process is called

18 / 50

18. The authority to approve a variation order of an amount exceeding Rs 5 but less than 15% of contract amount is

19 / 50

19. Tender does not contain

20 / 50

20. Which of the following types of selection is adopted broadly in Nepal for the procurement for services ?

21 / 50

21. The term CPM in construction management is an abbreviation of

22 / 50

22. The role of consultant is to

23 / 50

23. What are the key dates of a standard contracting procedure of a project?

24 / 50

24. Muster rolls are used for

25 / 50

25. The CPM stands for

26 / 50

26. A muster roll is

27 / 50

27. In critical path method (CPM), the actual performance of task is called

28 / 50

28. PERT analysis is based on

29 / 50

29. The dummy activity in CPM

30 / 50

30. Contractor’s profit and overhead is

31 / 50

31. The first stage of a construction is

32 / 50

32. Necessary elements of the estimate are

33 / 50

33. The difference between the time available to do the job and time required to do the job is known

34 / 50

34. Construction schedule is prepared after collecting

35 / 50

35. Which of the following in not a basic requirements for quality control method adapted in a project?

36 / 50

36. A contract is

37 / 50

37. Most of the works related to measurement of items and making entry to the measurement book is initiated by

38 / 50

38. Types of organizations used in construction industry is

39 / 50

39. Contractor profile is added for

40 / 50

40. Which method is known as minimum cost or maximum times schedule method

41 / 50

41. Work charge establishment.

42 / 50

42. As per the prevailing regulation (PRR) in Nepal, what is the % of the price escalation contingency to be provided at the end of the earth estimate preparation ?

43 / 50

43. What is the maximum overhead added to the rate analysis?

44 / 50

44. Line of balance technique used for

45 / 50

45. Most frequently used method of organizing labour for a construction project is based on

46 / 50

46. For the procurement of works, what is the maximum estimates amount for which a tender notice is not mandatory ?

47 / 50

47. Responsibility of overseer is to

48 / 50

48. The tender is

49 / 50

49. Various activities of a project, are shown on bar charts by:

50 / 50

50. Commonly adopted method if planning the construction activities and labour in a project to optimize the construction period is

The average score is 39%