In electrical works each switch is normally placed in

a) single phase b) neutral c) 3 phase d) single phase and neutral

Normally the size of PVC sewerage pipe for domestic purpose is

a) 65 mm O.D. and 110 mm O.D. b) 75 mm O.D. and 110 mm O.D. c) 110 mm O.D. ...

While designing septic tank, approximate volume requirement is taken as

a) 0.125 cu. meter per user b) 0.05 cu. meter per user c) 0.10 cu. meter per user d) 0.15 ...

Water requirement for a residential building is

a) 450 litres per head per day b) 200 litres per head per day c) 300 litres per head per ...

F.A.R. is the abbreviation of

a) floor analysis rate b) floor assessment level c) floor area relation d) floor area ratio

As per municipal by laws, the height of a building is taken from:

a) foot path level b) basement level c) plinth level d) road level